TOP THREE PROJECTS – More projects coming soon.

Arizona State University College at Lake Havasu City

General Construction, remodel and renovations

ASU Colleges at Lake Havasu City – a combination of remodel, renovation and new construction. This project was an existing middle school that was converted to a campus for Arizona State University. Extensive site work for utilities both on-site and offsite, remodel upgrade and renovation of existing classroom, gymnasium and administration office buildings.

Calvary Baptist Church, Lake Havasu City, AZ

Calvary Baptist Church was designed as a flexible multipurpose facility that consisted of a central sanctuary and two wings of classrooms that totaled approximately 24,000 square feet.

The building consist of a pre-engineered steel frame system connected to structural masonry walls. For aesthetics, the exposed steel structure and masonry walls are exposed along with polished concrete floors. The interior features an advanced high end audio/visual system and specialized sound control wall panels. The building exterior has a Copper color standing seam roof and EFIS wall system.

The building was designed to harness the natural beauty found in raw materials and the desert landscape.  The structure towers above Lake Havasu’s south side at 45 feet to the apex.

Spanky’s RV and Marine Parker, AZ

General Contracting and Metal Building Design of a new retail building approx. 14,000 square feet. This is a metal building with conventional metal roof and EFIS wall system.

The interior has exposed structural beam and columns, added ceiling and wall insulation, and exposed mechanical duct work. The offices, bathrooms, break room and mezzanine are wood framed.

Got a project? We are ready to talk!

928-667-2530 Office staff is ready